Our stoves are delivered fully built. You do not need to build or brick them – just put them in place and connect them to the chimney. The connection and chimney inspection should always be carried out or checked by a professional (chimney sweep) in accordance with local regulations.
Chimney requirements
- Masonry chimney with a flue with an internal diameter of 120–150 mm.
- The stove outlet has a diameter of 120 mm – on top for most models, at the rear for Model 5 and 25.
- Chimney height at least 6 m, minimum chimney draught 12 Pa.
- Connecting pipe length 1,5–2 m, horizontal pipes rising at 10–15° towards the chimney.
- Flue joints must be airtight so that the draught does not drop and flue gases do not escape into the room.
- If several appliances are connected to one chimney, they must be connected at least 0,5 m apart.
Safe clearances
| From |
Minimum distance |
| Wall (for good heat radiation) |
30 cm |
| Objects in front of the firebox side |
50 cm |
| Objects at the other sides |
30 cm |
| Flammable materials – back and sides |
40 cm |
| Flammable materials – front |
80 cm |
Ventilation
Fire consumes oxygen. In insulated houses with uPVC windows, make sure there is an air supply to the room where the stove stands.
First firing
- Open the firebox door and put in about 0,2 kg of wood shavings and 0,5 kg of wood.
- Open the start-up damper (direct draught) and set the air regulator fully open.
- Light the fire, close the door and, once the fire has caught, close the start-up damper.
- For the first few days, fire the stove gently so that the fireclay and mortar dry out slowly. A slight smell on the first day is normal.
What you get with the stove
The European CE certificate and the rating plates needed for chimney approval. More on the page Certificates. A complete operating and maintenance guide can be found in the technical information.